End user
• Automation engineer
• Maintenance engineer
• Maintenance technician
• Operator (Control room)
• Operator (Field)
Benefits
Environmental Objectives• Climate change mitigation
Operating Costs• Minimize energy usage
• Minimize raw materials
• Minimize total cost of ownership (TCO)
Operations• Maximize operational productivity
• Maximize operator confidence
• Maximize operator effectiveness
• Minimize operator errors
Production• Faster startup or setup/grade changes
• Maximize process availability
• Maximize process stability
• Maximize production uptime
• Minimize production disturbances
Quality• Maximize product quality
• Minimize quality losses
Reliability• Maximize assets availability
• Minimize maintenance costs
• Optimize inventory
Sustainability• Manage risks
Plant Lifecycle Management
• Maintain
• Operate
Group
Asset Performance Management
Industries
• Panelboard
• Paper & Board
• Pulp
• Pulp: Fiberline
Related Solutions