The Level 2 process automation for cold rolling mills is the link between the basic automation and customers product planning system (Level 3/ERP). This is a powerful tool for storing and configuring the production schedule and calculation of pass schedules and flatness presettings. It also assists the operator with the general handling of the product and process data by providing graphical visualization and reporting. With the Storage Management function paper coils, sleeves, etc. are handled. This includes drive commands for cranes.
End user
• Automation engineer
• Control engineer
• Maintenance engineer
• Maintenance manager
• Maintenance technician
• Operator (Control room)
• Operator (Field)
• Plant manager
• Process engineer
• Production manager
Benefits
Digital Capability• Analytic Modeling
• Data Integration
Operating Costs• Maximize energy production
• Maximize reuse of raw materials
• Minimize chemicals usage
• Minimize energy usage
• Minimize fuel usage
• Minimize raw materials
• Minimize total cost of ownership (TCO)
Production• Faster startup or setup/grade changes
• Maximize Maximum Sustainable Rate (MSR)
• Maximize process availability
• Maximize process stability
• Maximize production uptime
• Minimize production disturbances
• Set production closer to constraints
Productivity• Cross-functional collaboration
• Enable mobile worker efficiency
• Maintains technical expertise and knowledge
• Maximize engagement and productivity of personnel
• Maximize field visibility
• Maximize human effectiveness
• Maximize response and better decision-making
• Reliable remote startup
• Standardize enterprise best practices
Quality• Drive consistency in product manufacturing
• Maximize product quality
• Minimize cost with desired quality
• Minimize process variability
• Minimize quality losses
• Minimize start-up losses
• Respond to raw material variations
Reliability• Maximize MTBF (mean time between failures)
• Maximize MTTF (mean time to failure)
• Maximize assets availability
• Minimize MTTA (mean time to acknowledge)
• Minimize MTTR (mean time to recovery)
• Minimize MTTR (mean time to repair)
• Minimize MTTR (mean time to resolve)
• Minimize MTTR (mean time to respond)
• Minimize maintenance costs
• Minimize rework
• Optimize inventory
Sustainability• Cybersecurity awareness
• Guard personnel health and safety
• Manage risks
• Minimize emissions
• Minimize environment impact
• Minimize water usage
• Respond to business constraints (COVID-19, etc.)
Security
Cyber Security Product Expert - CSPE: Dennis Golenia -
Plant Lifecycle Management
• Commissioning
• Design
• Improve/Modify
• Install
• Learning curve
• Maintain
• Operate
• Shutdown
Group
Advanced Process Control
Industries
• Metals